Project Name:
Supply and Install new Stainless Steel Spent Grain bins

Description:
Two Part Project:
Part 1 – Redundant equipment removal;
Part 2 – Replace the components in part 1 with new equipment

Challenges:
Maintaining safety was considered one of the biggest risks on this project.  This was due to most of the work, being conducted at height using 220t cranes with 96m lifts.  This work was completed using BDR Stainless’s standard accredited AS 4801 Safety, AS 14001 Environment and ISO 9002 Quality systems.

Slide background
Slide background
Slide background

Industries we work with

We work across a range of industries including industrial, resources commercial, food & beverage and Government.

Learn more

  • Energy & Resources
  • Mining
  • Oil & Gas
  • Power Regeneration
  • Commercial
  • Food and beverage
  • Pharmaceutical
  • Construction
  • Government & Infrastructure
  • Road / Rail
  • Water
  • Pipelines