Project Name:
GP Stack Tower
Description:
BDR Stainless was awarded the Fabrication and Install of a new Fume Stack Tower at the client’s Salisbury steel mill.
Challenges:
This tower was built to replace an existing structure which had all but rusted away. The removal of the existing tower was a challenge to ensure it was completed safely without damage to property or personnel