Grain Replacement

HomeCase StudiesGrain Replacement

Project Name:
Supply and Install new Stainless Steel Spent Grain bins Castlemaine Perkins Brisbane QLD.  

Client Name: Lion XXXX, Milton Brewery

Value: $ 350,000.00

Description: Two Part Project; Part 1 – Redundant equipment removal, Part 2 – Replace the components in part 1 with new equipment

Completed: September 2016

Challenges:

Maintaining safety was considered one of the biggest risks on this project.  This was due to most of the work, being conducted at height using 220t cranes with 96m lifts.  This work was completed using BDR Stainless’s standard accredited AS 4801 Safety, AS 14001 Environment and ISO 9002 Quality systems.