GP Stack Tower

HomeCase StudiesGP Stack Tower

Project Name: 
GP Stack Tower

Client Name:
Orrcon

Value:

$80,000.00

Description:

BDR Stainless was awarded the Fabrication and Install of a new Fume Stack Tower at Orrcon’s Salisbury steel mill.  

Completed:

October 2016

Challenges:

This tower was built to replace an existing structure which had all but rusted away. The removal of the existing tower was a challenge to ensure it was completed safely without damage to property or personnel